Trails for Richmond Action Committee (TRAC)

TRAC Goals

1. Complete Richmond’s Bay Trail:
  • around the Ferry Point Loop;
  • from Wildcat Marsh Trail along San Pablo Creek to Richmond Parkway and through Point Pinole Regional Shoreline to Richmond's northern border;
  • along Harbour Way South as a Class I trail from historic Ford Assembly Building to Hoffman Blvd; 
  • connection with Point Molate and along the shoreline of the San Pablo Peninsula to Point San Pablo Yacht Harbor.
2. Encourage development of tributary routes linking inland neighborhoods with the Bay Trail and shoreline parks.

3. Continue to develop interpretative exhibits showcasing the rich human and natural history along the Bay Trail in Richmond.

4. Support pedestrian and bicycle access on the
Richmond/San Rafael Bridge.

Explore the Trails
Ferry Point Loop & Shipyard 3 Trail
Wildcat Marsh & Landfill Loop Trail
Marina Bay Trail
View the Richmond Bay Trail Calendar and all detailed maps which are available for key portions of Richmond’s Bay Trail.
image001.jpg
04_21_16_TRAC_map
Richmond Bay Trail Map (PDF) 

Mid Year Report

 
Download the colorful Richmond Bay Trail Mid Year Report to read about six projects now under construction or being designed to complete six miles of new Bay Trail in Richmond during 2017 …. plus 4.3 miles across the Richmond/San Rafael (RSR) Bridge. The report also features new attractions along Richmond’s 32 completed miles of Bay Trail..