Project Description


The proposed Project includes the development of a residential neighborhood that would consist of up to 200 condominiums (1-bedroom, 2-bedrooms and 3- bedrooms) in three-story buildings (some with four-story elements), approximately 300 parking spaces, and associated common areas and amenities. The Project would develop approximately 5.5 acres of the site and preserve the remaining 12.9 acres (approximately 70 percent of the site) of the 18.4 acres site as open space.

The buildings will have a height of 40-50 feet above the finished floor elevation of ground level units. Landscaping, pathways, and small open space areas would be installed throughout the site. Other planned neighborhood amenities include a recreation center, fitness center, and swimming pool. The Project also includes internal roads and infrastructure improvements. The Project may also include improvements to the existing right-of-way, including the addition of landscaping and lighting, and improvements to the San Francisco Bay Trail.

The Project includes a proposed General Plan amendment to change the land use designation of the site from Parks and Recreation to Medium Density Residential. The Project also includes a proposed change in the site’s zoning designation from Parks and Recreation (PR) to Planned Area District (PA), including exceeding the maximum building height limit of 35 feet for the Medium Density Residential General Plan designation.

Project Location


The Project site is located at 1135 Canal Boulevard, south and east of the intersection of Canal Boulevard and Seacliff Drive in the neighborhood of Point Richmond, in the City of Richmond, Contra Costa County (see Figure 1 in this NOP). The Project site is bounded by Miller-Knox Regional Shoreline park (which is managed by the East Bay Regional Park District [EBRPD]) to the north, Seacliff Drive and the residential community of Seacliff to the east, vacant property and Seacliff Drive to the south, and Miller-Knox Regional Shoreline park and the community of Seacliff to the west.


Planning Commission Public Hearing - February 1, 2018, 6:30 PM, 440 Civic Center Plaza, Council Chambers, 1st Floor


Public Hearing to consider a recommendation to the City Council on The Quarry Residential Project.

Design Review Board Public Hearing - December 13, 2017, 6:00 PM, 440 Civic Center Plaza, Council Chambers, 1st Floor


Public Hearing to consider a Design Review permit and planned area plan which is part of the planned area rezoning for the proposed Quarry Residential Project.

Draft Environmental Impact Report Available


A Draft Environmental Impact Report (DEIR) has been completed, which assesses the potential environmental impacts associated with the Project. The DEIR is available for review for review and comment.

Notice of Availability
Draft Environmental Impact Report (DEIR)
DEIR Appendices

Copies will also be available for review at the following locations:

Richmond Public Libraries: Main Branch 325 Civic Center Plaza, Richmond, CA 94804, and West Side Branch 135 Washington Avenue, Richmond, CA 94801 (Point Richmond); and City of Richmond Planning and Building Services Department, City Hall, 450 Civic Center Plaza, Richmond, CA, 94804. The Planning public counter is open Monday through Thursday from 8:30 a.m. to 4:00 p.m. and Friday from 8:30 a.m. to 12:30 p.m.

Pursuant to CEQA Guidelines Section 15105(a), a minimum forty-five-day (45) public review period is required and shall commence on the date of this notice (October 6, 2017). All written comments on this document must be submitted to the City of Richmond Planning Department within this 45-day review period, or by November 20, 2017, by 5:00 p.m. All written comments must be submitted to the City of Richmond Planning Division, 450 Civic Center Plaza, 2nd Floor, Richmond, CA 94804.

A public meeting to hear comments on the Draft EIR will be held at 6:30 p.m. on November 16, 2017 at the Planning Commission meeting held in the Council Chambers at 440 Civic Center Plaza in Richmond, 94804.

Please mail or email your written comments on the Draft EIR, no later than 5:00 p.m. on November 20, 2017, to: 

Lina Velasco, Project Manager II
City of Richmond Planning Division
450 Civic Center Plaza-2nd Floor
Richmond, CA 94804
Lina_Velasco@ci.richmond.ca.us

Please include in your written response the name and phone number of a contact person in your agency.

Subscribe for Updates


Please sign up on "Notify Me" if you are interested in receiving email updates for this project.