Project Description


The proposed Via Verdi Slope Stabilization Project (project) has been designed by the City of Richmond (City) to reconstruct a segment of the Via Verdi roadway that was damaged by a landslide in 2017; the road was closed at that time and an emergency roadway continues to provide access for the Sobrante Glen neighborhood. Reconstruction of the roadway requires installation of a culvert within San Pablo Creek, backfilled with engineered fill, to buttress the landslide and provide a stabilized footing for the roadway embankment. An offsite mitigation area is included as part of the project.

Review and Comment Period: Comments on the MND shall be sent in writing and must be received by 5:00 p.m. on Thursday, November 27, 2019, at the following address or email:

Lina Velasco
City of Richmond Planning Division
450 Civic Center Plaza
P.O. Box 4046
Richmond, CA 94804
lina_velasco@ci.richmond.ca.us

Report Availability: A copy of the MND is available for review online at www.ci.richmond.ca.us/viaverdiproject.

Copies are also available for review at the following locations: Richmond Public Library - Main Branch 325 Civic Center Plaza, Richmond, CA 94804 and City of Richmond, Planning and Building Department, City Hall, 450 Civic Center Plaza, Richmond, CA, 94804.

Start of Public Review: October 28, 2019                                  End of Public Review: November 27, 2019

Notice of Intent
MND Draft