Point Molate Mixed Use Project
Project Contact
Lina Velasco
Director of Community Development
Lina_Velasco@ci.richmond.ca.us
Project Location
The Point Molate Site is located on the San Pablo Peninsula within the City, in Contra Costa County. The Project Site is bounded by the San Francisco Bay to the west, open space parcels to the north and south, and the Chevron Richmond refinery to the east, with Potrero Ridge’s 480-foot hillsides separating these two sites. Approximately 142 acres of the approximately 413-acre Project Site are submerged in the San Francisco Bay, leaving approximately 271 acres above water. The Project Site is approximately 1.5 miles north of Interstate 580 (I-580) and the Richmond-San Rafael Bridge, and has direct freeway access through Stenmark Drive, a City-owned roadway.
Project Description
The Point Molate Mixed Use Project (Project) proposes a mixed-use community that would include the following components: open space, adaptive re-use of the historic cottages, adaptive re-use of the historic Winehaven buildings, and residential development.
The Modified Project proposes a mixed-use community that would include the following components:
- Approximately 1,260 newly constructed residential units.
- Approximately 374,572 square feet of rehabilitated existing structures and 250,000 square feet of new construction for mixed-use development that could include restaurant, retail, commercial, and/or residential uses.
- Approximately 10,000 square feet for an onsite joint fire and police substation and/or other community service uses.
- At least 70 percent of the total above-water Project Site area (approximately 193.06 acres) would remain as open space, including recreational areas, parks, trails (including an approximately 1.5-mile portion of the San Francisco Bay Trail along the shoreline), vista overlooks, and other similar spaces that are open to the public.
- A terminal on the existing pier that may be accessible to water transit options, such as ferries, water shuttles, and/or water taxis.
- New roads to serve the development within the Project Site; additionally, widening Stenmark Drive from the Project Site to I-580 Ramps.
- Utilities and infrastructure improvements that would be required to serve the new development.
Point Molate Fiscal Impact Analysis
- Point Molate Fiscal and Economic Impact Analysis
- Peer Review of Winehaven Prepared Fiscal Impact Analysis
City Council Meeting - Via Teleconference - Tuesday , September 8, 2020, 5:30 p.m.
The City Council of the City of Richmond will conduct a hearing to consider certification of the Final Subsequent Environmental Impact Report.
- Notice of Public Hearing
- Staff Report
- Attachment 1 - Resolution certifying the Final SEIR and adopting a Mitigation Monitoring and Reporting Program (MMRP), CEQA Findings of Facts and Statement of Overriding Considerations; Approving a General Plan map and text amendments; approving Design Guidelines with a Historic Conservation Plan and Planned Area District Plan; approving a Conditional Use Permit for a Shoreline Park in –S Overlay Zone; approving a Vesting Tentative Tract Map; approving a Major Design Review for Design Guidelines ; and approving a Disposition and Development Agreement with Winehaven Legacy LLC
- Exhibit A - Final Subsequent Environmental Impart Report, consisting of the Draft Subsequent Environmental Impact Report, Response to Comments, and Errata to Final SEIR and MMRP
- Exhibit B - CEQA Findings and Statement of Overriding Considerations
- Exhibit C - Mitigation Monitoring and Reporting Program
- Exhibit D - General Plan Amendment
- Exhibit E - Design Guidelines with Master PA Plan, Historic Conservation Plan, and Other Sections
- Exhibit F - Vesting Tentative Tract Map
- Exhibit G - Disposition and Development Agreement
- Exhibit H - Conditions of Approval
- Exhibit I - Technical Memorandum regarding Late Comments on SEIR
- Attachment 2 - Ordinance Rezoning the project site to PA, Planned Area District with-H, Historic District Overlay for the Winehaven Historic District
- Attachment 3 - Ordinance approving a Development Agreement
- Exhibit A - Development Agreement
Continued Item - Planning Commission Special Meeting - Via Teleconference - Thursday, August 20, 2020, 6:30 p.m.
Planning Commission Special Meeting - Via Teleconference - Monday, August 17, 2020, 6:30 p.m.
Public Hearing to consider a recommendation to the City Council on the: Certification of the Final Subsequent Environmental Impact Report including adopting a Mitigation Monitoring and Reporting Program, CEQA Findings of Fact and a Statement of Overriding Considerations; General Plan text and map amendments; Rezoning the project site to Planned Area (PA) district with an –H, Historic district overlay over the Winehaven Historic District and a –S, Shoreline Overlay for the shoreline band area; a Development Agreement, a Large Lot Vesting Tentative Map; Conditional Use Permit and a major Design Review of the PA Plan and the Point Molate Design Guidelines for the proposed Point Molate Mixed-Use Development Project, which proposes a mix of residential and non-residential uses, including office space and retail, along with open space including recreational areas, parks, trails (including a 1.5 mile portion of the San Francisco Bay Trail), vista overlooks, and other similar spaces open to the public at 2100 Stenmark Drive (APN: 561-100-008). Existing Zoning: RM-1, Medium Density Multi-Family Residential; RH, Single Family Hillside Residential; PR, Parks and Recreation; CG, Commercial General; IL, Industrial Light; and OS, Open Space District. The project also includes infrastructure and roadway improvements needed to support the proposed development.
- Notice of Public Hearing
- Staff Report
- Attachment 1 - Final Subsequent Environmental Impact Report (SEIR)
- Attachment 2 - Draft Resolution
- Exhibit A: CEQA Findings and Statement of Overriding Considerations
- Exhibit B: Mitigation Monitoring and Reporting Program
- Exhibit C: General Plan Amendment
- Exhibit D: Zoning Amendments
- Exhibit E: Design Guidelines with Master PA Plan, Historic Conservation Plan, and other sections
- Exhibit F: Vesting Tentative Map
- Exhibit G: Development Agreement
- Exhibit H: Conditions of Approval
- Attachment 3 - Public Comments Part 1
- Attachment 3 - Public Comments Part 2
- Attachment 3 - Public Comments Part 3
Planning Commission Meeting - Via Teleconference - Thursday, August 6, 2020, 6:30 p.m.
Final Subsequent Environmental Impact Report (SEIR)
Design Review Board Meeting - Via Teleconference - Wednesday, July 22, 2020, 6:00 p.m.
The Design Review Board will conduct a public hearing to consider a recommendation of a major design review of the planned area plan for the proposed planned area rezoning for the Point Molate Mixed-Use Development Project.
Historic Preservation Commission Meeting - Via Teleconference - Tuesday, July 14, 2020, 5:30 p.m.
The Historic Preservation Commission will conduct a public hearing to provide a recommendation to the City Council for the historic conservation plan for the portions of the Point Molate Mixed-Use Development Project.
Design Review Board Meeting - Via Teleconference - Wednesday, July 8, 2020, 6:00 p.m.
The Design Review Board will conduct a public hearing to consider a recommendation of a major design review of the planned area plan for the the proposed planned area rezoning for the Point Molate Mixed-Use Development Project.
Historic Preservation Commission Meeting - Via Teleconference - Thursday, June 25, 2020, 5:30 p.m.
PUBLIC HEARING to consider input on the draft General Plan map and text amendments, and provide a recommendation on Rezoning the Winehaven Historic District from a -L, Landmark, Overlay, to an -H, Historic, Overlay and Historic Conservation Plan for the portions of the Point Molate Mixed-Use Development Project proposed within the Winehaven Historic District.
- Notice of Public Hearing
- Staff Report
- Attachment 1 - General Plan Amendments
- Attachment 2 - Proposed Zoning Map
- Attachment 3 - Historic Conservation Plan (Section 4.0 of Design Guidelines)
- Chapter 4 - Design Guidelines Updated Diagrams
- Attachment 4 - Draft Winehaven Nomination
- Attachment 5 - Response to HPC Comments
- Attachment 6 - Memo to HPC
Design Review Board Study Session Via Teleconference - Wednesday, June 10, 2020, 6:00 p.m.
Study Session to receive and provide input on the proposed Point Molate Mixed-Use Development Project.
- Study Session Notice
- Staff Report
- Attachment 1 - General Plan Amendments
- Attachment 2 - Zoning Map
- Attachment 3 - PM Planned Area
- Attachment 4 - Vesting Tentative Map
- Attachment 5 - Draft Design Guidelines, dated May 4, 2020
- Attachment 6 - Response to DRB Comments
- Attachment 7 - Response to HPC Comments
- Comments DRB Meeting, June 10, 2020
Design Review Board Study Session Via Teleconference - Wednesday, May 27, 2020, 6:00 p.m. - MEETING CANCELED
Study Session to receive and provide input on the proposed Point Molate Mixed-Use Development Project.
Historic Preservation Commission Study Session Via Teleconference - Tuesday, April 14, 2020, 5:30 p.m.
Study Session to receive and provide input on the proposed Point Molate Mixed-Use Development Project.
SEIR Documents
- Updated Notice of Availability
- Updated Notice of Availability (Old see updated)
- Notice of Availability (Old see updated)
- Draft Subsequent Environmental Impact Report (SEIR)
- Point Molate Video
- Appendices A - K Compiled
- Appendices L - U Compiled
SEIR Appendices (Separated)
- Appendix A - Notice of Preparation
- Appendix B - Scoping Comments
- Appendix C - Preliminary Drainage Study
- Appendix D - Transportation Impact Analysis
- Appendix E - Preliminary Water and Wastewater Master Plan
- Appendix F - Water Supply Assessment
- Appendix G - Phase 1 Environmental Site Assessment
- Appendix H - Dry Utilities Technical Memorandum and Will Serve
- Appendix I - Preliminary Grading Analysis
- Appendix J - Rehabilitation Analysis (1)
- Appendix K - Explanation of Mitigation and Improvement Measures
- Appendix L - General Plan Consistency Table
- Appendix M - Air Quality Tables
- Appendix N - Climate Action Plan Consistency Table
- Appendix O - Bay Plan Consistency Table
- Appendix P - Biology Technical Studies
- Appendix Q -Historical Resource Documents
- Appendix R - Geotechnical Feasibility Memorandum
- Appendix S - City of Richmond Fire Hazard Reduction Vegetation Management Standards
- Appendix T - Environmental Noise and Vibration Assessment
- Appendix U - Richmond Municipal Sewer District Wastewater Infrastructure Analysis
Preparation of Subsequent Environmental Impact Report (SEIR)
The City is the Lead Agency and will be preparing a Subsequent Environmental Impact Report (SEIR) for the project. The City invites comments on the scope and content of the SEIR in response to the Notice of Preparation (NOP). The NOP will be circulated for a 30-day review period. Comments on the scope of the SEIR should focus on the potentially significant environmental effects that the Modified Project may have on the physical environment that should be addressed in the SEIR, ways in which those effects might be minimized and potential alternatives to the Modified Project that should be addressed in the SEIR. Comments on the NOP must be received in writing at the above City of Richmond mailing address to the attention of Lina Velasco, Director of Planning and Building Services, or via e-mail to lina_velasco@ci.richmond.ca.us, by 4:00 p.m. on August 12, 2019. In addition, comments may be provided at the Public Scoping Meeting noticed below.
Public Scoping Meeting
Monday, July 29, 2019, 6:00 p.m.
Council Chambers
440 Civic Center Plaza
Richmond, CA 94804
Point Molate Scoping Meeting Presentation
Public Scoping Meeting Transcript, July 29, 2019
2011 Point Molate Final Environmental Impact Report (EIR)
Point Molate Exclusive Right to Negotiate (ERN) Agreements
Subscribe for Updates
Please sign up on "Notify Me" if you are interested in receiving email updates for this project. Follow these instructions to subscribe:
1. Enter your email address and then select "Sign In"
2. Follow the on-screen instructions