This project will improve traffic flow along the 23rd Street corridor by installing fiber optic cable to connect and synchronize various signalized intersections along 22nd and 23rd Streets. The conduits and fiber optic cables will be installed by directional bore method and traffic cabinets will be connected to the cables. Video detection cameras will be installed and will be able to detect multiple directions of traffic with a single camera. Funded by Measure J and Traffic Impact fees.