23049 - Rheem Creek Restoration

4124a4d0-2c68-4bfb-9400-ef6afe0a2ee2
e42dc581-df2b-427c-89ab-f342a0166947

PROJECT DESCRIPTION

This project intends develop numerous concept channel treatment alternatives at the request of the San Francisco Regional Water Quality Control Board (Water Board). The Water Board’s involvement resulted in additional bio-engineered slope treatments to reduce the quantity and size of rock in the restored channel.


PROJECT TIMELINE

March 2026

Completed design.

May 2026

Bid Advertise.

July 2026

Bid Award.

August 2026

Construction Start.

Summer 2027

Construction End.

ADDITIONAL INFORMATION

Project Manager: Mike Owyang
Project Phase: Design
Project Category: 
Storm Drainage and Watershed Improvements
Project Location:  
Library Drive
Neighborhood:
Fairmede/Hilltop
City Council District: 
4