The Project is located between Hensley Street and Lincoln Ave at the Burlington North Sante Fe (BNSF) grade separate overpast crossing. In general, the project scope is to complete the sidewalk gap from Shields Reid Neighborhood to the North Iron Triangle Neighborhood, including the extension of bike lanes and pavement signage. The project construction is described as follows including incidentals as describe in these special provisions: demolition (sidewalk, curb & gutter, driveways, guardrails, asphalt concrete, and sign post), 2” grind and inlay, base repairs, site preparation, installation of new improvements (sidewalk, curb & gutter, driveways, guardrails, asphalt concrete, pavement striping and signage), bicycle safety measures, and other incidentals required to complete the construction that are required by the Drawings, State Standard Specifications of these Special Provisions.
PROJECT TIMELINE
November 2024
Design complete.
November 2024
Bid Advertise.
June 2025
Bid Award.
August 2025
Construction Start.
September 2025
Construction End.
ADDITIONAL INFORMATION
Project Manager: Mike Owyang Project Phase: Construction Project Category: Transportation Project Location: 7th Street between Hensley St and Lincoln Ave Neighborhood: Iron Triangle City Council District: 1